RE: REPORT ON THE VISITATION OF NPDC (NIGERIAN PETROLEUM thoroughgoing evolution COMPANY.LTD). Sequel to the email dated on the twenty-second of b align district 2011 sent from the Lagos office on information regarding the Visitation of the officials for reexamination. I write to inform the watchfulness that the said officials by name calling: and O.U, twain of the drilling Department of N.P.D.C Visited the pitch location as of 1:00pm and conducted a Satisfactory and Hitch Free control make for. The limited review action was lead by the Maintenance, Materials Man and the HSE supervisor. brushup was through with(p) at the specify site and as come up as the face packsite Respectively. RIG SITE UMU #7 INSPECTION. The visitant were Initially Welcome by on behalf of the Rig bus worth who unfortunately was indisposed and both men were assumption orientation by the HSE department before the inspection process commenced . Areas of assesessment are as follows: T he S.C.R Room, Engine room, Mud- tank, Rig Floor, Stores and then in conclusion met with the crew members whom were presently at work at the Rig Floor. Series of questions about the Rig were asked and were adequately answered from a professional perspective, which eventually both men verbally state their satisfaction. refugee camp out SITE INSPECTION.
Ordercustompaper.com is a professional essay writing service at which you can buy essays on any topics and disciplines! All custom essays are written by professional writers!
Soon after the inspection at the Rig site, the next visit was at the Camp site which series of question was thrown about the entire number of the hands that can be accommodated at camp during the spudding and completion stages of the oil production process, a total no of 139 was estimated which they la! mented was enough to accommodate their figures. The otherwise areas inspected were the Laundry, the 2 men rooms, Galley, bungle hall and recreation which both men acknowledge was up to their standard. The inspection process was locomote up with questions about how briefly NRG Would be rounding up their project with Midwestern which an estimated time period of a month or two plus was carefully explained to them and they equally promised to sign on in touch with the...If you want to get a full essay, order it on our website: OrderCustomPaper.com

If you want to get a full essay, visit our page: write my paper

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.